Ceiling and walls in – it’s starting to look like a workshop

Well, the ceiling and walls are up downstairs and the workshop is really starting to take shape (we can almost hear the musical tones of a 2-stroke engine floating through the air already…)
Well, the ceiling and walls are up downstairs and the workshop is really starting to take shape (we can almost hear the musical tones of a 2-stroke engine floating through the air already…).
[flickr-gallery mode=”search” tags=”downstairs,ceiling” tag_mode=”all” sort=”date-taken-desc” user_id=”68535384@N07″]

We’ve also cut a new door through into the upstairs office:
[flickr-gallery mode=”search” tags=”upstairs,door” tag_mode=”all” sort=”date-taken-desc” user_id=”68535384@N07″]

Next week; the lights go up, the floor goes down and the pallet racking is installed.

Join our mailing list to receive occasional emails with news and offers. Sign up now
  • arbjobs.com
  • arbtalk.co.uk
  • Scott Fraser Training